Metropolis
A monumental city skyline as a stage, built and taken down every week of the season.
IN · Metropolis — Ants, Ushuaïa IbizaOFF · 6 h build · 3 h strike — see belowClientHigh Scream
LocationUshuaïa Ibiza
Year2019
TypeShow
IN/OFF roleEngineering, fabrication, on-site installation
ExpertiseEngineering · Fabrication · Scenography
5 weeksfrom concept approval to delivery
6 hbuild, every week
3 hstrike
The project
Based on a concept by High Scream, IN/OFF adapted the initial sketches into an operational scenography for a high-capacity outdoor venue, keeping the visual impact while making it buildable. The stage became a mega-city of skyscrapers and industrial scenery.
The project was delivered five weeks after concept approval. Storage limits, wind resistance and fast on-site operations shaped every choice: the set was installed and dismantled each week of the season, with a six-hour build and a three-hour strike.
OFF · Behind it
6 h build · 3 h strike
Every week of the season. Designed around storage limits and wind load. Engineering, fabrication, on-site installation.




Photos: High Scream Production